    The Rail Accident Investigation Branch (RAIB) has released (11 July 2019) a report into the death of a railway worker at Stoats Nest Junction, Purley on 6th November 2018.

    The sole purpose of RAIB investigations is to prevent future accidents and incidents and improve railway safety. RIAB does not establish blame, liability or carry out prosecutions.

    The report summary states:

    ”At around 00:28 hrs on the morning of 6 November 2018, a passenger train from London Victoria to Three Bridges, travelling at about 69 mph (111 km/h), struck and fatally injured a track worker in the vicinity of Stoats Nest Junction, near Purley.

    The accident occurred after the track worker had placed equipment on the track as part of the arrangements for the protection of an engineering possession. Having placed the protection equipment, the track worker then walked along the track until he reached the end of the protected area, and continued walking with his back to rail traffic on an open line. He may have been going to look at some lineside equipment, and believed that no trains would approach on the line he was walking along.

    He was probably fatigued, and may have been distracted by personal issues linked to the fact that a second person, the possession support assistant who was supposed to be with the track worker, was not present as he had not attended for work that night.

    Underlying factors associated with the accident were the nature of the work which exposed the track worker to risk while he was putting out protection for the possession; that the labour supplier’s management processes had not sufficiently identified and addressed the risk of fatigue among zero hours contracted staff; and that the labour supplier’s management processes had neither identified nor prevented staff absenting themselves from work without being detected.”

    RIAB Recommendations and Learning Points

    The RAIB has made two recommendations and identified three learning points:

    1. Network Rail to improve the way its labour suppliers manage the risks associated with the use of workers on zero hours contracts, in particular the management of their lifestyle and fatigue; and
    2. Vital Human Resources Ltd, the labour supplier, to commission an independent review of the actions it has taken following the accident at Stoats Nest Junction to assess their effectiveness in detecting and preventing the type of behaviour seen in the accident, and reduce the risks from fatigue.

    The RAIB has previously made recommendations about reducing the exposure of staff to risk while carrying out possession protection duties, and these are still being considered by the railway industry.

    • Learning Point 1 – highlights the need for safety-critical staff to be aware that distraction caused by family issues or other employment may affect their fitness for duty;
    • Learning Point 2 – highlights the importance of track workers being alert to the risks on the railway, even when they believe that they are working under protection; and
    • Learning Point 3 – the limitations of the railway industry’s ‘Sentinel’ system if it is used for establishing the presence of staff on site.
    Zero hours contracts review required

    Simon French, Chief Inspector of Rail Accidents said:

    “This sad accident was the first in more than four years involving the death of a track worker who was struck by a train.

    When workers are employed on a casual basis on zero hours contracts, there can be great pressure for them to try and juggle multiple jobs to make ends meet. The possible effects of such patterns of employment on fatigue and fitness for work are significant. We are therefore recommending that the railway industry reviews the way it manages the use of staff on zero hours contracts, to minimise the risk associated with this pattern of work.

    The continuing requirement for people to go onto the track to place and remove red lamps and explosive detonators, as part of the arrangements for protecting engineering work on the railway, is something that RAIB has queried before. Following a fatality at Reading in 2007, and again after a near-miss in north London in 2017, we recommended that the railway industry should find ways of eliminating the need for people to be exposed to the risk of being struck by trains in these circumstances.

    Modern technology means that there are many ways in which the position of trains can be established, and warnings given to drivers and to track workers, if a train movement goes beyond a safe limit. I believe that the industry should continue to explore ways of eliminating the need for Victorian methods of protection on the twenty-first century railway. It is deeply saddening that another person has died while putting down protection for his fellow railway workers- there must be a better way.

    The need to better manage the continuing risk to those who work on the tracks has again been highlighted by the tragic death of two track workers who were struck and killed by a train at Margam, near Port Talbot, on 3 July. RAIB has started a detailed investigation into the causes of this dreadful event. This will clearly identify the lessons to be learnt and any necessary recommendations for the improvement of safety.

    My thoughts are with all those affected by both these tragic accidents.“

     

    Latest Construction Health and Safety News

    CONSTRUCTION SAFETY NEWS – END OF NEW CONTENT

    The addition of content on this website ceased on 17th April 2020.

    Material posted before this date can be found by clicking on our SEARCH NEWS DATABASE function.

    Posted on 3rd May 2020

    CDM REGULATIONS 2015: GUIDES AND TEMPLATES

    Summary of our advice and tools to aid CDM 2015 compliance

    Read the rest of this article »

    Posted on 21st April 2020

    HSE WARN OF NEED FOR RPE FACE FIT TEST AND CHECK

    Incorrectly fitted RPE will not protect the wearer from dangers to health

    Read the rest of this article »

    Posted on 16th April 2020

    CORONA VIRUS: LATEST SITE OPERATING PROCEDURES

    Industry Bodies publish risk management guidance Version 3

    Read the rest of this article »

    Posted on 15th April 2020

    TOWER CRANE OUT OF SERVICE SAFETY ALERT

    Important advice from Construction Plant-hire Association and HSE

    Read the rest of this article »

    Posted on 30th March 2020

    HSE PLAN AND CONSTRUCTION PRIORITIES 2020/21

    Appointed CDM 2015 Principal Designers remain focus of HSE inspections

    Read the rest of this article »

    Posted on 30th March 2020

    COVID-19 ADVICE & GUIDANCE FOR CONSTRUCTION

    BuildUK support industry with advice, guidance and information

    Read the rest of this article »

    Posted on 30th March 2020

    HSE TARGETING WELDING FUME CANCER RISK

    Inspections to enforce improved controls required by new risk evidence

    Read the rest of this article »

    Posted on 24th February 2020

    HSE TO OVERSEE NEW BUILDING SAFETY REGIME

    Government to deliver biggest change in building safety for a generation

    Read the rest of this article »

    Posted on 21st January 2020

    FESTIVE GREETINGS TO ALL OUR READERS

    Read the rest of this article »

    Posted on 20th December 2019

    SELECTED NEWS POSTED RECENTLY ON TWITTER

    PP Construction Safety logo and link to home page [1]Links to other construction health and safety related news reports

    Read the rest of this article »

    Posted on 18th November 2019

    HSE LOOK TO LOCAL AUTHORITIES FOR CDM SUPPORT

    Council Inspectors focus on CDM client duties – asbestos, fragility and RCS

    Read the rest of this article »

    Posted on 14th November 2019

    HSE WELDING FUME REVISED GUIDANCE PUBLISHED

    New research evidence on cancer link prompts revision on welding fume

    Read the rest of this article »

    Posted on 14th November 2019

    STRUCTURAL SAFETY BODY LATEST NEWSLETTER

    CROSS publishes reports and expert comment on a range of issues

    Read the rest of this article »

    Posted on 18th October 2019

    HSE RISK REDUCTION THROUGH DESIGN AWARD

    Regulator seeks to promote hazard avoidance and risk minimisation

    Read the rest of this article »

    Posted on 18th October 2019

    HSE START PROJECT HEALTH RISK INTERVENTIONS

    Regulator set to check health risks assessed and controls in place

    Read the rest of this article »

    Posted on 30th September 2019

    AIF NATIONAL WORKING AT HEIGHT CONFERENCE

    HSE Construction Head to speak at Access Industry Forum conference

    Read the rest of this article »

    Posted on 23rd September 2019

    NEW HSE HAVS CALCULATOR TO HELP CONTROL RISK

    New calculator includes “cautious estimates” for common tools

    Read the rest of this article »

    Posted on 23rd September 2019

    IMPROVING CDM DESIGNER HAZARD AWARENESS

    Research explores power of “multi-media digital tool” for design hazards

    Read the rest of this article »

    Posted on 27th August 2019

    DEMOLITION FEDERATION ON RECENT INCIDENTS

    NFDC ‘statement of awareness’ follows unplanned collapses

    Read the rest of this article »

    Posted on 27th August 2019

    RAISING COMPETENCE AND MAKING BUILDINGS SAFER

    Life-safety-critical disciplines urged to act on Interim Report

    Read the rest of this article »

    Posted on 27th August 2019

    BUILDING WORKS COMPROMISED GAS SAFETY

    Company and director fined after work created risk to residents

    Read the rest of this article »

    Posted on 27th August 2019

    HSE SPEAK AT ACCESS INDUSTRY CONFERENCE 2019

    AIF National Working at Height Conference November 2019

    Read the rest of this article »

    Posted on 6th August 2019

    STRUCTURAL SAFETY BODY LATEST NEWSLETTER

    CROSS publishes reports and expert comment on a range of issues

    Read the rest of this article »

    Posted on 23rd July 2019

    CONSIDERING TEMP WORKS IN PERMANENT DESIGN

    Useful overview for civil and structural engineers on contemporary practice

    Read the rest of this article »

    Posted on 23rd July 2019
  • Higher Safety Higher Safety Chipmunk Data Chipmunk Data