    SOLAR SPECIALIST FINED £153K OVER FRAGILE FALL

    Safety equipment issued without training and instruction in safe use

    P V Solar UK Limited has been fined £153,000 after a workman, aged 32, was seriously injured when he fell through a fragile roof light in Kent in 2013.  The roof light was located on an outbuilding housing a swimming pool.

    The pool water partially cushioned his fall but he made a heavy impact with the side and flooring and was as unable to return to work until 2016. He was part of a three man team working on the pool building to replace faulty solar panels installed by the same company in April 2011.

    The fragile roof also contained eight roof lights and he fell through one of the rooflights as he walked on the roof carrying a panel.

    Canterbury Crown Court heard that a scaffold tower, ladder and safety harness were provided. However, the team had not received any formal training or instruction in use which rendered the equipment “effectively useless”.

    Other measures could have been taken e.g. full scaffolding or hard covers for the rooflights.

    Workers “left to own devices” with inadequate equipment

    HSE established that initial installation work in 2011 was completed without incident despite a lack of safety equipment. In 2011 the company was served with an HSE Prohibition Notice regarding work on a fragile roof in Bristol and was well aware of the need for effective precautions.

    P V Solar UK Limited, of Glasgow, was fined a total of £153,000 and ordered to pay a further £29,480 in costs after pleading guilty to three separate breaches of the Work at Height Regulations 2005.

    After the hearing, HSE Inspector Melvyn Stancliffe said:

    “The injured worker suffered serious injury in the fall and could have been killed. He and his colleagues were effectively left to their own devices with equipment that was not wholly suited for the task at hand. In short, better equipment, training and supervision should have been provided.

    Working on or near a fragile roof or materials is not a task to be undertaken without proper planning, and without having the appropriate safety measures in place at all times. There is considerable free guidance available from the HSE regarding the precautions needed when working at height, including on or near fragile roof coverings.”

     

    Latest Construction Health and Safety News

    TRADING STANDARDS AND HSE ACT IN CONCERT

    Director given prison term over fraud and health and safety breaches

    Read the rest of this article »

    Posted on 15th October 2018

    BUILDER ERROR CAUSED RESIDENT FALL FROM BALCONY

    Director prosecuted over refurb project danger to others

    Read the rest of this article »

    Posted on 12th October 2018

    FORMER HSE BOSS CONDEMNS VALUE ENGINEERING

    Resident and public safety must match workforce safety progress

    Read the rest of this article »

    Posted on 12th October 2018

    RETAILER FINED AFTER FAN AMPUTATES FINGERS

    Maintenance engineer injured during roof fan repair works

    Read the rest of this article »

    Posted on 12th October 2018

    POOR PLANT ISOLATION CAUSED CONVEYOR DANGER

    Arm of fitter trapped between conveyor drum and belt

    Read the rest of this article »

    Posted on 11th October 2018

    BUILDING OWNER FAILED TO CHECK FOR ASBESTOS

    Prison sentence for businessman after previous HSE enforcement

    Read the rest of this article »

    Posted on 11th October 2018

    YOUNG WORKER LOSES FINGERS IN SAWING INCIDENT

    Provision of training and information could not be proved

    Read the rest of this article »

    Posted on 11th October 2018

    HSE ENFORCEMENT WEEKLY UPDATE 10th OCT 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 10th October 2018

    MD PROSECUTED ALONGSIDE ERRANT COMPANY

    Director held personally responsible for poor site conditions

    Read the rest of this article »

    Posted on 1st October 2018

    ASBESTOS REMOVAL STARTED BEFORE R & D SURVEY

    Asbestos insulation board found outside building being refurbished

    Read the rest of this article »

    Posted on 27th September 2018

    INEFFECTIVELY BRAKED SAW CAUSED AMPUTATIONS

    Retro-fitting of precautions may be required on older machines

    Read the rest of this article »

    Posted on 27th September 2018

    FALL THROUGH FRAGILE CEILING TILES

    Failure to implemented control measures for working near fragile surfaces

    Read the rest of this article »

    Posted on 27th September 2018

    HSE SEEKS CONSTRUCTION ‘DUST BUSTER’ PARTNERS

    Regulator uses social media to raise dust dangers and using right controls

    Read the rest of this article »

    Posted on 24th September 2018

    MAJOR HOMES BUSINESS EXPOSED PUBLIC TO RISK

    Residential property refurb project created carbon monoxide danger

    Read the rest of this article »

    Posted on 24th September 2018

    HSE CONSTRUCTION DUST CONTROL ‘BLITZ’ STARTS

    Regulator inspections will check health taken as seriously as safety

    Read the rest of this article »

    Posted on 20th September 2018

    FLOOR CONSTRUCTION SYSTEM OF WORK UNSAFE

    Welder fell 3m from mezzanine area through purlin openings

    Read the rest of this article »

    Posted on 20th September 2018

    WORKER SUFFERS FATAL BURNS IN OXYGEN RICH AREA

    Sparks from angle grinder ignited clothing of workman in confined space

    Read the rest of this article »

    Posted on 19th September 2018

    RIBA PUBLISH DRAFT POST GRENFELL FIRE SAFETY PLAN

    Architects institute consults on ‘golden thread of fire safety information’

    Read the rest of this article »

    Posted on 19th September 2018

    MAJOR UK CONTRACTORS HIT BY MAJOR FINES

    Firms ordered to pay over £3m after foot trapped in rotating ‘screw’

    Read the rest of this article »

    Posted on 19th September 2018

    DRIVER DIED TRAPPED BETWEEN TRAILER AND VEHICLE

    Firm fined £1.5 million over failure to assess coupling operations

    Read the rest of this article »

    Posted on 14th September 2018

    ACTUAL SYSTEM OF WORK WAS OPPOSITE OF RAMS

    Workman fell 4m through fragile asbestos roof sheet

    Read the rest of this article »

    Posted on 13th September 2018

    CDM PRINCIPAL DESIGNER FUNCTION MISUNDERSTOOD?

    Consultants claim CDM 2015 design risk management has ‘gone backwards’

    Read the rest of this article »

    Posted on 8th September 2018

    RISK ASSESSED PRECAUTIONS NOT IMPLEMENTED

    Action not paperwork essential to prevent fall during lifting operation

    Read the rest of this article »

    Posted on 7th September 2018

    CROSSRAIL PUBLISH BEST PRACTICE H&S GUIDES

    Sharing major project best practice can leave a lasting legacy

    Read the rest of this article »

    Posted on 5th September 2018

    SCHOOL STAFF LACKED ASBESTOS AWARENESS TRAINING

    Council fined £200k over asbestos flue and gasket rope failures

    Read the rest of this article »

    Posted on 5th September 2018
    Ethentic Ethentic Higher Safety Higher Safety Chipmunk Data Chipmunk Data
  • Higher Safety Higher Safety Chipmunk Data Chipmunk Data Ethentic Ethentic