Ethentic Ethentic Higher Safety Higher Safety Chipmunk Data Chipmunk Data
  • Higher Safety Higher Safety Chipmunk Data Chipmunk Data Ethentic Ethentic

    CDM REGULATIONS 2015: DESIGNER TRAINING EVENTS

    Cost-effective events for CDM 2015 Designers and Principal Designers

    This training provides a 2-3 hour updating and discussion session for busy architects and others regarding the CDM Regulations 2015 and in particular the new Designer and Principal Designer (PD) responsibilities.

    The event delivers high quality CPD in your own offices at a time to suit you with minimum disruption to the business.

    Before a practice can be appointed as a Designer or PD the client must satisfy themselves that the practice has the necessary skills, knowledge, experience and organisational capability. The practice may not accept such appointments unless they fulfil this condition.

    The events are informed by my 17 years experience in managing HSE Construction Operations.

    Please see details below and call me on 01462 612381 to discuss your needs.

    Best wishes

    Philip Poynter MSc DipSH CMIOSH and OSHCR
    IOSH Chartered logo  

    Safety Through Design: CDM Regulations 2015

    The sessions provides architects and other designers with a sound understanding of the CDM Regulations 2015 and the practical implications for design practices.

    The content is tailored to meet the needs of individual firms and can cover:

    • Overview of CDM 2015 requirements;
    • Client, Designer, Principal Designer etc. roles explained;
    • Key actions required of the Principal Designer;
    • Pre-Construction Information responsibilities;
    • Assessing and demonstrating your capability;
    • New designer risk avoidance duties;
    • Securing the necessary risk management expertise;
    • Designing for safer construction, maintenance and use;
    • Provision of necessary information to others;
    • Achieving compliance through simplicity;
    • Record keeping requirements and audit trails;
    • Avoiding prosecution, HSE fees and reputational harm;
    • Patterns of injury and ill-health; and
    • Discussion of delegate concerns and questions.

    Event Fee: £700.00 plus Travel Costs and VAT

    CDM 2015 Information and Templates

    See CDM 2015 Survey Results for the findings of our CDM 2015 Five Minute Online Survey.

    We have published a great deal of further information and templates designed to support Clients, Designers, Principal Designers/Contractors and Contractors in meeting their duties under CDM Regulations 2015.

    Latest Construction Health and Safety News

    FAILURE TO ISOLATE LEAVES WORKMAN PARALYSED

    Conveyor guards removed before power source isolated

    Read the rest of this article »

    Posted on 16th October 2018

    TRADING STANDARDS AND HSE ACT IN CONCERT

    Director given prison term over fraud and health and safety breaches

    Read the rest of this article »

    Posted on 15th October 2018

    BUILDER ERROR CAUSED RESIDENT FALL FROM BALCONY

    Director prosecuted over refurb project danger to others

    Read the rest of this article »

    Posted on 12th October 2018

    FORMER HSE BOSS CONDEMNS VALUE ENGINEERING

    Resident and public safety must match workforce safety progress

    Read the rest of this article »

    Posted on 12th October 2018

    RETAILER FINED AFTER FAN AMPUTATES FINGERS

    Maintenance engineer injured during roof fan repair works

    Read the rest of this article »

    Posted on 12th October 2018

    POOR PLANT ISOLATION CAUSED CONVEYOR DANGER

    Arm of fitter trapped between conveyor drum and belt

    Read the rest of this article »

    Posted on 11th October 2018

    BUILDING OWNER FAILED TO CHECK FOR ASBESTOS

    Prison sentence for businessman after previous HSE enforcement

    Read the rest of this article »

    Posted on 11th October 2018

    YOUNG WORKER LOSES FINGERS IN SAWING INCIDENT

    Provision of training and information could not be proved

    Read the rest of this article »

    Posted on 11th October 2018

    HSE ENFORCEMENT WEEKLY UPDATE 10th OCT 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 10th October 2018

    MD PROSECUTED ALONGSIDE ERRANT COMPANY

    Director held personally responsible for poor site conditions

    Read the rest of this article »

    Posted on 1st October 2018

    ASBESTOS REMOVAL STARTED BEFORE R & D SURVEY

    Asbestos insulation board found outside building being refurbished

    Read the rest of this article »

    Posted on 27th September 2018

    INEFFECTIVELY BRAKED SAW CAUSED AMPUTATIONS

    Retro-fitting of precautions may be required on older machines

    Read the rest of this article »

    Posted on 27th September 2018

    FALL THROUGH FRAGILE CEILING TILES

    Failure to implemented control measures for working near fragile surfaces

    Read the rest of this article »

    Posted on 27th September 2018

    HSE SEEKS CONSTRUCTION ‘DUST BUSTER’ PARTNERS

    Regulator uses social media to raise dust dangers and using right controls

    Read the rest of this article »

    Posted on 24th September 2018

    MAJOR HOMES BUSINESS EXPOSED PUBLIC TO RISK

    Residential property refurb project created carbon monoxide danger

    Read the rest of this article »

    Posted on 24th September 2018

    HSE CONSTRUCTION DUST CONTROL ‘BLITZ’ STARTS

    Regulator inspections will check health taken as seriously as safety

    Read the rest of this article »

    Posted on 20th September 2018

    FLOOR CONSTRUCTION SYSTEM OF WORK UNSAFE

    Welder fell 3m from mezzanine area through purlin openings

    Read the rest of this article »

    Posted on 20th September 2018

    WORKER SUFFERS FATAL BURNS IN OXYGEN RICH AREA

    Sparks from angle grinder ignited clothing of workman in confined space

    Read the rest of this article »

    Posted on 19th September 2018

    RIBA PUBLISH DRAFT POST GRENFELL FIRE SAFETY PLAN

    Architects institute consults on ‘golden thread of fire safety information’

    Read the rest of this article »

    Posted on 19th September 2018

    MAJOR UK CONTRACTORS HIT BY MAJOR FINES

    Firms ordered to pay over £3m after foot trapped in rotating ‘screw’

    Read the rest of this article »

    Posted on 19th September 2018

    DRIVER DIED TRAPPED BETWEEN TRAILER AND VEHICLE

    Firm fined £1.5 million over failure to assess coupling operations

    Read the rest of this article »

    Posted on 14th September 2018

    ACTUAL SYSTEM OF WORK WAS OPPOSITE OF RAMS

    Workman fell 4m through fragile asbestos roof sheet

    Read the rest of this article »

    Posted on 13th September 2018

    CDM PRINCIPAL DESIGNER FUNCTION MISUNDERSTOOD?

    Consultants claim CDM 2015 design risk management has ‘gone backwards’

    Read the rest of this article »

    Posted on 8th September 2018

    RISK ASSESSED PRECAUTIONS NOT IMPLEMENTED

    Action not paperwork essential to prevent fall during lifting operation

    Read the rest of this article »

    Posted on 7th September 2018

    CROSSRAIL PUBLISH BEST PRACTICE H&S GUIDES

    Sharing major project best practice can leave a lasting legacy

    Read the rest of this article »

    Posted on 5th September 2018
    Ethentic Ethentic Higher Safety Higher Safety Chipmunk Data Chipmunk Data
  • Higher Safety Higher Safety Chipmunk Data Chipmunk Data Ethentic Ethentic