Turner Access Higher Safety Total Access
Total Access Ethentic Chipmunk Data
Chipmunk Data Turner Access Ethentic

CDM REGULATIONS 2015: DESIGNER TRAINING EVENTS

Cost-effective events for CDM 2015 Designers and Principal Designers

This training provides a 2-3 hour updating and discussion session for busy architects and others regarding the CDM Regulations 2015 and in particular the new Designer and Principal Designer (PD) responsibilities.

The event delivers high quality CPD in your own offices at a time to suit you with minimum disruption to the business.

Before a practice can be appointed as a Designer or PD the client must satisfy themselves that the practice has the necessary skills, knowledge, experience and organisational capability. The practice may not accept such appointments unless they fulfil this condition.

The events are informed by my 17 years experience in managing HSE Construction Operations.

Please see details below and call me on 01462 612381 to discuss your needs.

Best wishes

Philip Poynter MSc DipSH CMIOSH and OSHCR
IOSH Chartered logo  

Safety Through Design: CDM Regulations 2015

The sessions provides architects and other designers with a sound understanding of the CDM Regulations 2015 and the practical implications for design practices.

The content is tailored to meet the needs of individual firms and can cover:

  • Overview of CDM 2015 requirements;
  • Client, Designer, Principal Designer etc. roles explained;
  • Key actions required of the Principal Designer;
  • Pre-Construction Information responsibilities;
  • Assessing and demonstrating your capability;
  • New designer risk avoidance duties;
  • Securing the necessary risk management expertise;
  • Designing for safer construction, maintenance and use;
  • Provision of necessary information to others;
  • Achieving compliance through simplicity;
  • Record keeping requirements and audit trails;
  • Avoiding prosecution, HSE fees and reputational harm;
  • Patterns of injury and ill-health;
  • Personal safety during site visits; and
  • Discussion of delegate concerns and questions.

Event Fee: £595.00 plus Travel Costs and VAT

CDM 2015 Information and Templates

See CDM 2015 Survey Results for the findings of our CDM 2015 Five Minute Online Survey.

We have published a great deal of further information and templates designed to support Clients, Designers, Principal Designers/Contractors and Contractors in meeting their duties under CDM Regulations 2015.

Latest Construction Health and Safety News

FIRMS FINED £2M OVER FALLING PIPE FATALITY

Incorrect stacking of pipes triggered fall and crushing of workman

Read the rest of this article »

Posted on 20th April 2018

DOMESTIC PROJECT PC HANDED JAIL TERM

Workman fell from unprotected roof edge on dormer extension

Read the rest of this article »

Posted on 20th April 2018

MAJOR CONTRACTOR ERRED ON FRAGILE ROOF RISK

Firms fine £965,000 after painter fell through waiting room roof

Read the rest of this article »

Posted on 19th April 2018

HSE ENFORCEMENT UPDATE 19th APRIL 2018

hselogo1Prosecutions and enforcement notices update and analysis

Read the rest of this article »

Posted on 19th April 2018

STRUCTURAL SAFETY BODY LATEST NEWSLETTER

CROSS publishes reports and expert comment on a range of issues

Read the rest of this article »

Posted on 18th April 2018

NEW BIM SPEC FOR SHARING H&S INFORMATION

Specification for sharing health and safety info during construction projects

Read the rest of this article »

Posted on 17th April 2018

MANAGERS FORGED ASBESTOS DOCUMENTATION

Removal licence obtained using fake training and medical certificates

Read the rest of this article »

Posted on 17th April 2018

FINE OVER INCORRECT AND MISLEADING SURVEY

Specialist asbestos company failed to detect AIB on demolition project

Read the rest of this article »

Posted on 17th April 2018

IGNORING HSE ADVICE PENALISED BY LARGE FINE

Contractor fined over £50k for persistent WAH and welfare failings

Read the rest of this article »

Posted on 17th April 2018

PRISON OVER BASEMENT EXCAVATION AND COLLAPSE

Building contractor jailed after house collapsed in Brighton

Read the rest of this article »

Posted on 17th April 2018

DEFEATING POWER INTERLOCK CAUSED FLASHOVER

Systems for managing electrical safety found to be inadequate

Read the rest of this article »

Posted on 17th April 2018

LADDER SAFETY FAILURES ATTRACT MASSIVE FINE

National window firm left workers to ‘own devices’

Read the rest of this article »

Posted on 12th April 2018

FALLING MATERIAL STRUCK WORKMAN IN EXCAVATION

Risks of working in and near excavations highlighted by incident

Read the rest of this article »

Posted on 4th April 2018

HSE ENFORCEMENT WEEKLY UPDATE 4th APRIL 2018

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 4th April 2018

HOUSING ASSOCIATION FAILED ON VIBRATION RISK

Assessment, management and health surveillance all found wanting

Read the rest of this article »

Posted on 3rd April 2018

OCCUPIER AND CONTRACTOR FINED OVER FALL

Employee assisting contractor fell through roof during re-roofing project

Read the rest of this article »

Posted on 3rd April 2018

HSE FEARFUL OF GROWING ’BLUE TAPE’ BURDEN

hselogo1ISO 45001 could generate fresh business to business demands

Read the rest of this article »

Posted on 3rd April 2018

HSE ENFORCEMENT WEEKLY UPDATE 21st MAR 2018

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 28th March 2018

INCIDENTS: PASSER-BY STRUCK BY BRICKS

Pack of bricks appear to have fallen from crane

Read the rest of this article »

Posted on 28th March 2018

HSE RECONSIDER HOW TO INFLUENCE SMALLER FIRMS

hselogo1Regulator advice and messages are failing to chime with the SME businesses

Read the rest of this article »

Posted on 27th March 2018

DANGEROUS REMOVAL OF ASBESTOS CEMENT

Workers smashed asbestos sheets with crowbars whilst at risk of falling

Read the rest of this article »

Posted on 27th March 2018

HSE LAUNCH CONIAN SHARING AND SUPPORT PLATFORM

hselogo1New HSE web community now open to the public

Read the rest of this article »

Posted on 27th March 2018

FIRM FAILING ON HAVS SURVEILLANCE FINED £50,000

Door manufacturer failed to manage sanding and buffing tool vibration

Read the rest of this article »

Posted on 27th March 2018

PRE-CAST FIRM FINED OVER FINGER AMPUTATION

Lack of guarding and training triggered table saw injury

Read the rest of this article »

Posted on 26th March 2018

HSE STRIKE BEFORE A FALL ON SOLAR PANEL PROJECT

Director and company pay price for lack of fall prevention precautions

Read the rest of this article »

Posted on 26th March 2018
Turner Access Chipmunk Data
Total Access Ethentic
Higher Safety Turner Access