    FRAGILE ROOF REPLACEMENT PROJECT LACKED PLANNING

    Risky roofing refurb work spotted by ‘off-duty’ HSE inspector

    Aston Roofing North West Ltd has been fined after roofwork was undertaken without precautions which created serious risk of injury at a Flintshire project in November 2012.

    Mold Magistrates heard (10 May) that the Merseyside firm was contracted to replace the fragile asbestos cement roof sheets on light industrial units with new metal roof cladding.

    On 1 November 2012 an off-duty HSE inspector spotted two workmen on the roof of one of the units. He could see that no safeguards were in place to prevent a fall from height and immediately prohibited work on the project.

    The court heard that numerous ‘fall from height’ risks were found at the site including:

    • access onto the roof via an untied ladder;
    • no safeguards to prevent a fall through the fragile roofing material; and
    • nothing to prevent a fall from the edges of the roof.

    The workers were some four to five metres from the ground.

    Firm neglected to implement the most basic safety measures

    Aston Roofing North West Ltd, Kenilworth Drive, Pensby, Wirral, Merseyside pleaded guilty to breaching Regulation 6(3) of the Work at Height Regulations 2005. The company was fined £1,000 and ordered to pay costs of £100.

    Speaking after the hearing, HSE Inspector Chris Wilcox said:

    “The dangers of working at height are well known in the roofing industry yet poor safety standards and lack of safeguards still exist among some contractors.

    These employees were working on fragile roofs and yet Aston Roofing North West had neglected to implement even the most basic safety measures to minimise the risks of falls. It is very fortunate that nobody was injured.

    The prosecution should serve as a reminder to all building contractors to ensure working at height is properly planned and robust safety precautions taken. Employers have a legal duty to manage safety and failing to do so too often ends in tragedy.”

    Latest Construction Health and Safety News

    HSE SAFETY ALERT: TOWER CRANE BRAKES

    Collapse of tower crane jib in high winds prompts HSE warning

    Read the rest of this article »

    Posted on 11th December 2018

    VISITING ENGINEER CRUSHED BY SCAFFOLD TUBES

    Principal contractor “signed off” contractor storage arrangements

    Read the rest of this article »

    Posted on 11th December 2018

    CONCRETE EJECTED BY PUMPING UNIT CLAIMED LIFE

    Company and director failed to train and supervise pumping operations

    Read the rest of this article »

    Posted on 5th December 2018

    HSE ENFORCEMENT WEEKLY UPDATE 5th DEC 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 5th December 2018

    REFRESHED GUIDANCE ON FITNESS TO OPERATE PLANT

    Construction plant medical fitness Good Practice Guide

    Read the rest of this article »

    Posted on 4th December 2018

    MAJOR CONTRACTOR & LUL USED UNSAFE SYSTEM

    Work method to eliminate moving vehicle hazard not adopted

    Read the rest of this article »

    Posted on 4th December 2018

    OVERTURNING LORRY CAUSED DEATH OF DRIVER

    Groundworks project stockpiling arrangements not properly managed

    Read the rest of this article »

    Posted on 3rd December 2018

    FORTH BRIDGE LIFTING OPERATION NOT PLANNED

    Major project PC failed to plan, supervise and carry out lift safely

    Read the rest of this article »

    Posted on 3rd December 2018

    DEVELOPER FAILED ON ASBESTOS ASSESSMENT

    HSE inspection revealed refurb works without asbestos survey

    Read the rest of this article »

    Posted on 28th November 2018

    POST DRIVER HAMMER CRUSHED HAND OF WORKMAN

    Unsafe system of work for vehicle crash barrier installation

    Read the rest of this article »

    Posted on 28th November 2018

    WORKER FELL FROM LOFT THROUGH CEILING

    Major house builder lacked understanding of loft fragile surfaces risk

    Read the rest of this article »

    Posted on 28th November 2018

    NEW SITE DUMPER SAFETY GUIDANCE ISSUED

    Construction plant sector concerns prompts CPA consults on draft

    Read the rest of this article »

    Posted on 28th November 2018

    CCTV INSTALLER FELL THROUGH FRAGILE ROOFLIGHT

    Contractor failed to properly plan and control the risks

    Read the rest of this article »

    Posted on 28th November 2018

    VISITOR DIED FALLING INTO CONCEALED BASEMENT

    Contractor failed to protect basement void on domestic project

    Read the rest of this article »

    Posted on 28th November 2018

    RACKING FALL REVEALED UNSAFE SYSTEM OF WORK

    European firm fined £300,000 after UK sub-contractor employee fell

    Read the rest of this article »

    Posted on 18th November 2018

    FAILURE TO ACT ON VIBRATION AND SILICA HAZARDS

    Worker health put at risk during stripping of furnace lining

    Read the rest of this article »

    Posted on 18th November 2018

    MAJOR FM FIRM FAILED TO MAINTAIN BACK-UP POWER

    Power loss at laboratory site created potential risk from biological agents

    Read the rest of this article »

    Posted on 18th November 2018

    IGNORING HSE PROHIBITIONS COST FIRM £250,000

    CDM 2015 and work at height requirements repeatedly breached

    Read the rest of this article »

    Posted on 16th November 2018

    ROOF COLLAPSED UNDER EXCESS LOADING

    Director and company fined over roof design failures

    Read the rest of this article »

    Posted on 11th November 2018

    FORK LIFT OVERTURNED IN SCAFFOLDING YARD

    Untrained operator suffered life changing crush injuries

    Read the rest of this article »

    Posted on 10th November 2018

    STRUCTURAL SAFETY ALERT: EFFECTS OF SCALE

    SCOSS issues alert after concerns disclosed over ‘large structures’

    Read the rest of this article »

    Posted on 7th November 2018

    ASBESTOS EXPOSED BY UNTRAINED WORKERS

    Contractor failed to act properly despite HSE intervention

    Read the rest of this article »

    Posted on 7th November 2018

    GAS MAIN STRIKE REPAIR CAUSED SEVERE BURNS

    Contractor excavator damage to gas pipe ends in £1.2m fine

    Read the rest of this article »

    Posted on 7th November 2018

    REBAR FELL FROM FLT IN UNSAFE LIFTING OPERATION

    Multiple fractures caused by inappropriate use of fork lift

    Read the rest of this article »

    Posted on 7th November 2018

    POORLY PLANNED LIFT DISMANTLE INJURED WORKMAN

    Counterweight or suspension rope struck worker in lift shaft

    Read the rest of this article »

    Posted on 1st November 2018
    Ethentic Ethentic Higher Safety Higher Safety Chipmunk Data Chipmunk Data
  • Higher Safety Higher Safety Chipmunk Data Chipmunk Data Ethentic Ethentic

    One Response to “FRAGILE ROOF REPLACEMENT PROJECT LACKED PLANNING”

    1. HSE ENFORCEMENT WEEKLY UPDATE 17th JULY 2013 | PP Construction Safety News Desk Says:

      […] FRAGILE ROOF REPLACEMENT PROJECT LACKED PLANNING […]