Turner Access Higher Safety Total Access
Total Access Ethentic Chipmunk Data
Chipmunk Data Turner Access Ethentic

ASBESTOS IN SCHOOLS SIGNPOSTS AND GUIDANCE

HSE useful summary for all involved with asbestos in schools

Asbestos was extensively used as a building material in the UK from the 1950s through to the mid-1980s. It was used for a variety of purposes, typically fireproofing and insulation. Any building built before 2000 (houses, factories, offices, schools, hospitals etc) can contain asbestos.

System buildings (for example CLASP, SCOLA, SEAC, MACE, ONWARD) constructed during the period 1945 -1980 were widely used for the construction of school premises.  These buildings can have structural columns fire proofed with asbestos containing materials (ACMs).

In 2007 a ‘CLASP’ working group was set up to advise on the potential asbestos fibre release in CLASP and other similar system built schools.  Guidance on the management of asbestos in system build premises was published in 2007. 

Duty to manage asbestos

The Control of Asbestos Regulations 2006 includes the ‘duty to manage asbestos’ in non-domestic premises.  The responsibility falls to the duty holder. In many cases, this is the person or organisation that has clear responsibility for the maintenance or repair of non-domestic premises.

Guidance on the duty to manage asbestos can be found in the Approved Code of Practice The Management of Asbestos in Non-Domestic Premises, L127, ISBN 9780 7176 6209 8 and on the duty to manage area of the HSE website.

Inspection initiatives in schools

In 2009/10 and 2010/11 HSE undertook sample inspections in the education sector to assess duty holder’s compliance with the Control of Asbestos Regulations 2006. The findings of these initiatives have been published.

HSE has developed an Asbestos checklist for schools PDF. This checklist is based on the questions that formed part of the 2010/11 inspections, and will help schools to review their asbestos management arrangements. It asks key questions to help schools check if suitable precautions are in place, and to record any further action that is needed.

Raising awareness

HSE works with stakeholders to support the development of school specific guidance and advice.  The Department for Education (DfE) have published guidance on managing asbestos in schools. This provides information and advice for those who manage schools or oversee the maintenance and repair of school buildings.  The guidance is aimed at head teachers, governors, and other members of the school management team, but will also be of interest to school staff.  Although the guidance has been produced for schools in England, it includes information and links to useful resources for schools and colleges across Great Britain.

Guidance

Latest Construction Health and Safety News

REVERSING EXCAVATOR CRUSHED WORKMAN

Lack of management system to segregate pedestrians and vehicles

Read the rest of this article »

Posted on 21st September 2017

CLIENT FINED £2.5 MILLION AFTER CONTRACTOR DEATH

Fatal fall through roof leaves client responsible for massive fine

Read the rest of this article »

Posted on 21st September 2017

HSE ENFORCEMENT WEEKLY UPDATE 20th SEPT 2017

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 20th September 2017

NEW EDGE PROTECTION INSTALLATION TRAINING

Trade body launches CSCS backed edge protection installer qualification

Read the rest of this article »

Posted on 18th September 2017

GOVERNMENT CALLS FOR ACTION ON ILL-HEALTH

Business leaders accept charge of inaction on work-related ill-health

Read the rest of this article »

Posted on 18th September 2017

FIRM FAILED TO ENFORCE FORK LIFT SEAT BELT USE

Operator suffered fatal crush injuries after FLT overturned

Read the rest of this article »

Posted on 18th September 2017

DIRECTOR AND FOREMAN JAILED OVER FATAL FALL

Failure to act on HSE advice ended in gross negligence manslaughter

Read the rest of this article »

Posted on 18th September 2017

PRISON SENTENCE FOR ROOFING CONTRACTOR

Council H&S officers reported dangerous roof work to HSE

Read the rest of this article »

Posted on 14th September 2017

HSE ENFORCEMENT WEEKLY UPDATE 14th SEPT 2017

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 14th September 2017

LADDER STANDARDS MOVE UP A RUNG OR TWO

Ladder Association guide to fundamental changes in ladder standard

Read the rest of this article »

Posted on 12th September 2017

SILICA (RCS) DUST LIMIT – THE ONLY WAY IS DOWN?

US regulator cuts RCS exposure standard to half UK limit

Read the rest of this article »

Posted on 12th September 2017

SAFE2TORCH – REDUCING FLAT ROOF FIRE RISK

Industry body seeks to reduce ‘torch’ triggered fires at design stage

Read the rest of this article »

Posted on 8th September 2017

FIRM AND DIRECTOR SENTENCED OVER GAS RISK

Poorly planned extension prevented effective gas venting

Read the rest of this article »

Posted on 7th September 2017

£1 MILLION CLIENT FINE FOLLOWS FATAL FALL

Electrician died after fall from step ladder provided by client

Read the rest of this article »

Posted on 7th September 2017

HSE ENFORCEMENT WEEKLY UPDATE 6th SEPT 2017

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 7th September 2017

HAVS HEALTH CHECK PROMPTS HSE PROSECUTION

Assessment of vibration exposure and control measures found wanting

Read the rest of this article »

Posted on 7th September 2017

HSE LUNG DISEASE SUMMIT TARGETS SILICA DUST (RCS)

Regulator starts major initiative on lung disease in construction

Read the rest of this article »

Posted on 1st September 2017

HSE COST RECOVERY NOW “FULLY INDEPENDENT”

hselogo1New Fee for Intervention disputes procedure now in place

Read the rest of this article »

Posted on 1st September 2017

CLIENT FINED AS CDM 2015 PRINCIPAL CONTRACTOR

Failure by client to appoint attracts PC duties by default

Read the rest of this article »

Posted on 30th August 2017

JOINER PARALYSED AFTER FALL THROUGH JOISTS

Fall prevention and risk minimisation measures not taken

Read the rest of this article »

Posted on 30th August 2017

HSE ENFORCEMENT WEEKLY UPDATE 30th AUG 2017

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 30th August 2017

COMPLAINT COSTS CONTRACTOR £145,000 IN FINES

HSE prosecute CDM 2015 Principal Contractor over risk without injury

Read the rest of this article »

Posted on 29th August 2017

HSE ENFORCEMENT WEEKLY UPDATE 23rd AUG 2017

hselogo1Prosecutions and enforcement notices weekly update and analysis

Read the rest of this article »

Posted on 23rd August 2017

HSE CONSTRUCTION FATALITY RECORDS: Q1 2017/18

Latest HSE fatality records reveal four (4) deaths in first three months

Read the rest of this article »

Posted on 23rd August 2017

HSE ON SILICA DUST (RCS): RISK MANAGEMENT UPDATE

New guidance available on key HSE Construction Sector priority

Read the rest of this article »

Posted on 23rd August 2017
Turner Access Chipmunk Data
Total Access Ethentic
Higher Safety Turner Access