    CLIENT BLAMED FOR CONTRACTOR CABLE STRIKE

    Failure to provide CDM pre-construction information punished in court

    Northgate Vehicle Sales Ltd of Darlington has been fined after a construction worker suffered severe burns to his face, neck and arms when he struck a buried electricity cable. The injured man was installing metal fencing during a car park refurbishment project in November 2010.

    HSE investigators found that relevant pre-construction information, including existing hazards such as buried electricity cables, had not been provided to the contractor.

    Darlington Magistrates’ Court heard (6 February) that the installation of the fencing required an excavation in the ground to insert the base of each fence post. The contractor was told there were no buried electricity cables. This was incorrect.

    During use of a ground breaker the tool struck one of two 11kV cables buried at some 80cm below ground. This vaporised the tip of the breaker into a cloud of flame and molten metal, causing severe burns of varying depths to the workmans arms and some burns to his face and neck.

    Wealth of guidance available for contractors and the client

    Northgate Vehicle Sales Ltd pleaded guilty to breaching Regulation 10(1)(b) CDM Regulations 2007 which requires the client to ensure that every contractor is provided with pre-construction information. The company was fined £12,000. The company was also ordered to pay £6,123.55 costs.

    After the hearing, HSE inspector Jonathan Wills said:

    “The injuries sustained by the worker could have easily resulted in him losing his life. He suffered severe burns and is still recovering from those injuries following an incident that could have been avoided had Northgate Vehicle Sales Ltd requested service plans and given them to those carrying out the construction work.

    The risk of striking underground cables is well known throughout the construction industry and the law says you must take precautions to avoid danger.

    There is a wealth of guidance available for contractors and the clients for whom the work is being carried out to help them manage the risks effectively.”

    Latest Construction Health and Safety News

    HSE CONSTRUCTION DUST CONTROL ‘BLITZ’ STARTS

    Regulator inspections will check health taken as seriously as safety

    Read the rest of this article »

    Posted on 20th September 2018

    FLOOR CONSTRUCTION SYSTEM OF WORK UNSAFE

    Welder fell 3m from mezzanine area through purlin openings

    Read the rest of this article »

    Posted on 20th September 2018

    WORKER SUFFERS FATAL BURNS IN OXYGEN RICH AREA

    Sparks from angle grinder ignited clothing of workman in confined space

    Read the rest of this article »

    Posted on 19th September 2018

    RIBA PUBLISH DRAFT POST GRENFELL FIRE SAFETY PLAN

    Architects institute consults on ‘golden thread of fire safety information’

    Read the rest of this article »

    Posted on 19th September 2018

    MAJOR UK CONTRACTORS HIT BY MAJOR FINES

    Firms ordered to pay over £3m after foot trapped in rotating ‘screw’

    Read the rest of this article »

    Posted on 19th September 2018

    HSE ENFORCEMENT WEEKLY UPDATE 19th SEPT 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 19th September 2018

    DRIVER DIED TRAPPED BETWEEN TRAILER AND VEHICLE

    Firm fined £1.5 million over failure to assess coupling operations

    Read the rest of this article »

    Posted on 14th September 2018

    ACTUAL SYSTEM OF WORK WAS OPPOSITE OF RAMS

    Workman fell 4m through fragile asbestos roof sheet

    Read the rest of this article »

    Posted on 13th September 2018

    CDM PRINCIPAL DESIGNER FUNCTION MISUNDERSTOOD?

    Consultants claim CDM 2015 design risk management has ‘gone backwards’

    Read the rest of this article »

    Posted on 8th September 2018

    RISK ASSESSED PRECAUTIONS NOT IMPLEMENTED

    Action not paperwork essential to prevent fall during lifting operation

    Read the rest of this article »

    Posted on 7th September 2018

    CROSSRAIL PUBLISH BEST PRACTICE H&S GUIDES

    Sharing major project best practice can leave a lasting legacy

    Read the rest of this article »

    Posted on 5th September 2018

    SCHOOL STAFF LACKED ASBESTOS AWARENESS TRAINING

    Council fined £200k over asbestos flue and gasket rope failures

    Read the rest of this article »

    Posted on 5th September 2018

    INCIDENT: MEWP OVERTURN IN CITY CENTRE

    Images show aftermath of mobile elevating platform collapse

    Read the rest of this article »

    Posted on 5th September 2018

    SAFETY ALERT: DEFECTIVE SCAFFOLD COUPLER

    National Access and Scaffolding Confederation issues warning

    Read the rest of this article »

    Posted on 31st August 2018

    DEMOLISHING INTERNAL WALL REVEALED ASBESTOS

    Firm lacked survey and asbestos management plan for premises

    Read the rest of this article »

    Posted on 31st August 2018

    NEW HEALTH AND SAFETY TEST FOR ARCHITECTS

    RIBA raise the bar for members on design risk management and ‘life safety’

    Read the rest of this article »

    Posted on 31st August 2018

    POWER BUSINESSES FAILED ON LIFTING OPERATION

    Panel fell on workman during turbine maintenance project

    Read the rest of this article »

    Posted on 31st August 2018

    MAJOR INFRASTRUCTURE FIRM COMMITS TO ZERO HARM

    Behaviours to deliver zero lost time injury incident rate by 2021

    Read the rest of this article »

    Posted on 31st August 2018

    MANAGING TOWER CRANE FALLING OBJECT RISK

    CPA issues new technical information note

    Read the rest of this article »

    Posted on 31st August 2018

    POST EXPLOSION ASBESTOS WORK WAS UNSAFE

    Asbestos cement panels removed and cut with power tools

    Read the rest of this article »

    Posted on 31st August 2018

    FALL THROUGH UNFLOORED FACTORY ROOF SPACE

    Non-routine tasks require assessment and clear risk controls

    Read the rest of this article »

    Posted on 31st August 2018

    SEVENTH LONDON CYCLIST DEATH DURING 2018

    Building products vehicle involved in death of Queens doctor

    Read the rest of this article »

    Posted on 17th August 2018

    MAJOR CONTRACTOR FAILED TO SUPERVISE LIFT

    Errors whilst lifting pre-cast concrete blocks fined £600,000

    Read the rest of this article »

    Posted on 14th August 2018

    FIRM FINED £400,000 OVER VIBRATING TOOLS RISK

    Hand-held orbital sanders, rivet guns, grinders and drills caused harm

    Read the rest of this article »

    Posted on 14th August 2018

    OVERHEAD POWER AND EARTHING OF SCAFFOLDS

    NASC combines updates advice on scaffold electrical risks

    Read the rest of this article »

    Posted on 9th August 2018
    Ethentic Ethentic Higher Safety Higher Safety Chipmunk Data Chipmunk Data
  • Higher Safety Higher Safety Chipmunk Data Chipmunk Data Ethentic Ethentic