    PLANNING SUPERVISOR PROSECUTED BELATEDLY UNDER CDM94

    Architect appointed as PS prosecuted alongside contractor over 2006 cable strike

    DSM Demolition Ltd (DSM) and Gould Singleton Architects Ltd (GSA) have been fined after a demolition worker was engulfed in flames whilst cutting through an 11,000 volt cable at an electricity substation in Worcester in July 2006.

    Worcester Crown Court heard that DSM was demolishing a metal casting foundry when the workman cut through a live cable connected to a switching unit on a substation. He was engulfed by flames and suffered 20 per cent burns leaving him with permanent disabilities.

    HSE investigators found that appointed Planning Supervisor GSA and demolition contractor DSM failed to make adequate checks to ensure that the power supply had been disconnected.

    GSA told DSM that all services to the site had been terminated when the power supply remained live. DSM failed to ensure the electrical services had been disconnected before starting demolition.

    CDM co-ordinators must pass on ‘correct’ information

    DSM Demolition Ltd of Birmingham breached Section 2(1) of the Health and Safety at Work etc Act and was fined £40,000 and ordered to pay £100,000 costs. Gould Singleton Architects Ltd of Halesowen breached Section 3(1) of the Health and Safety at Work etc Act 1974 and Regulation 15(3)(e) of the Construction (Design and Management) Regulations 1994. The company was fined £20,000 and ordered to pay £20,872 costs.

    Speaking after the hearing, HSE inspector Tariq Khan said:

    “Neither of the two companies prosecuted today had made adequate checks to ensure that the power supply to the cable required to be cut by Mr Harris had been terminated. Had they done so then this incident would never have happened and Mr Harris would not have suffered such serious injuries.

    Construction, design and management co-ordinators must ensure that the information they pass on to contractors which could affect the safety of their workers is correct. Likewise, demolition contractors must follow safe systems of work at all times and ensure they check information provided to them about services on site with independent, competent sources.”

    Latest Construction Health and Safety News

    CDM 2015 PRINCIPAL DESIGNER FINED OVER FIRE RISK

    PD and PC failed to comply with CDM 2015 responsibilities

    Read the rest of this article »

    Posted on 23rd May 2018

    SENTENCING GUIDELINES UNDER THE MICROSCOPE

    Lawyer argues guidelines undermine reduction in ‘regulatory burden’

    Read the rest of this article »

    Posted on 23rd May 2018

    HSE ENFORCEMENT WEEKLY UPDATE 23rd MAY 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 23rd May 2018

    PANEL STRUCK WORKMAN DURING LIFTING OPERATION

    Third party contractor falls victim of poor lift planning

    Read the rest of this article »

    Posted on 21st May 2018

    DIRECTOR LED HAZARDOUS WORK AT HEIGHT

    Three occasions when work lacked suitable and sufficient precautions

    Read the rest of this article »

    Posted on 21st May 2018

    RISK ASSESSED BUT CONTROLS FOUND WANTING

    Joiner fell through unprotected opening on roof of new building

    Read the rest of this article »

    Posted on 21st May 2018

    RIBA CRITICAL OF HACKITT REVIEW FINAL REPORT

    High rise residential review dismissed as “major missed opportunity”

    Read the rest of this article »

    Posted on 21st May 2018

    HSE ENFORCEMENT WEEKLY UPDATE 16th MAY 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 16th May 2018

    CONSTRUCTION SECTOR DEATHS: THE ‘BIG THREE’

    HSE in-year fatalities for 2017/18 may indicate upward trend

    Read the rest of this article »

    Posted on 16th May 2018

    SCAFFOLDING SITE ACCIDENTS AT RECORD LOW

    NASC Annual Report reveals all time low in 2017 incidents

    Read the rest of this article »

    Posted on 14th May 2018

    DUMPER TRUCK HAND-BRAKE NOT MAINTAINED

    Workman injured when pinned against stack of concrete blocks

    Read the rest of this article »

    Posted on 14th May 2018

    SPARE POWER INTERLOCK KEY CAUSED DEATH

    Dangerous machinery safety precautions defeated for maintenance tasks

    Read the rest of this article »

    Posted on 10th May 2018

    HSE ENFORCEMENT WEEKLY UPDATE 9th MAY 2018

    hselogo1Prosecutions and enforcement notices register latest version

    Read the rest of this article »

    Posted on 9th May 2018

    COLLAPSED CAR PARK WAS UNDER REPAIR

    Rusted steel supports triggered collapse of fascia and floor

    Read the rest of this article »

    Posted on 8th May 2018

    DUMPER OVERTURN CAUSED FATAL INJURIES

    Precautions during spoil heap creation were inadequate

    Read the rest of this article »

    Posted on 8th May 2018

    HARDWOOD DUST CONTROL NOT MAINTAINED

    Manufacturer failed to examine and test local extraction system

    Read the rest of this article »

    Posted on 8th May 2018

    SCAFFOLD CONTRACTOR OVERLOOKED MAJOR HAZARD

    Well-known risk unidentified during scaffold erection project

    Read the rest of this article »

    Posted on 8th May 2018

    THREE FIRMS FINED £1/2M FOR FRAGILE RISK FAILURES

    Fall through rooflight hazard poorly planned and managed

    Read the rest of this article »

    Posted on 2nd May 2018

    CONTRACTORS IGNORED ASBESTOS RISK

    Asbestos pipe lagging worked on without licence and proper precautions

    Read the rest of this article »

    Posted on 2nd May 2018

    HSE ENFORCEMENT UPDATE 2nd MAY 2018

    hselogo1Prosecutions and enforcement notices update and analysis

    Read the rest of this article »

    Posted on 2nd May 2018

    SOFT LANDING BAGS TRIGGERED A FALL!

    Fall arrest bag thrown from scaffold took workman with bag

    Read the rest of this article »

    Posted on 1st May 2018

    FAILURE TO NOTIFY HSE PREVENTED INVESTIGATION

    Regulator prosecutes over RIDDOR non-compliance

    Read the rest of this article »

    Posted on 1st May 2018

    CLIENT AND CONTRACTOR TOGETHER IN COURT

    Fragile roof fall exposes client failure to manage project

    Read the rest of this article »

    Posted on 1st May 2018

    UNTRAINED DUMPER DRIVER SURVIVES OVERTURN

    Inadequate barriers plus lack of operator and manager training

    Read the rest of this article »

    Posted on 1st May 2018

    PROJECT CLIENT PROSECUTED UNDER CDM 2015

    Building demolished without suitable precautions to prevent danger

    Read the rest of this article »

    Posted on 1st May 2018
    Total Access Total Access Ethentic Ethentic
    Higher Safety Higher Safety Chipmunk Data Chipmunk Data
  • One Response to “PLANNING SUPERVISOR PROSECUTED BELATEDLY UNDER CDM94”

    1. HSE ENFORCEMENT WEEKLY UPDATE 9TH MAY 2012 | PP Construction Safety News Desk Says:

      […] PLANNING SUPERVISOR PROSECUTED BELATEDLY UNDER CDM94 […]